Bankier Primary School Path, Banknock, Falkirk

This path project has enabled the creation of important link in the local path...

Last Updated: 12 October 2025

Connel Ferry Station School Transport Improvements

Following an increase in the frequency of the Oban to Glasgow rail service, Argyll...

Last Updated: 12 October 2025

Bracklinn Bespoke Steel Timber Bridge

The previous bridge over Bracklinn Falls was washed out in floods in 2004 and...

Last Updated: 12 October 2025

Cawder ‘Warren Truss’ Bridge

Previous footbridge was closed following a structural inspection, and subsequently determined to be beyond...

Last Updated: 12 October 2025

Dorrator ‘Steel Truss’ Bridge

The project involved the replacement of a 100 year old Harper “swing bridge”. The...

Last Updated: 12 October 2025

Delivering Upland Path Maintenance in the Cairngorms

The National Trust for Scotland, the Upper Deeside Access Trust (now the Cairngorms Outdoor...

Last Updated: 12 October 2025

Geocomposite – Lochgilphead Shared Use Path

This route provides a cycling and walking route across the east side of Lochgilphead,...

Last Updated: 12 October 2025

Upland path repairs protecting Steall Gorge

A path through Steall Gorge has existed for centuries but the current path was...

Last Updated: 12 October 2025

Rural Path Surfacing – Islay, Argyll and Bute

The community on Islay wished to link Port Ellen with Ardbeg to allow sustainable...

Last Updated: 11 October 2025

Ultitrec – Wilkies Path, Drymen

There is an extensive network of longstanding footpaths in the Drymen area, in various...

Last Updated: 11 October 2025

Use of Locally Won ‘As Dug’ Materials for Path Construction

The design and construction of lowland paths has traditionally used quarried stone that is...

Last Updated: 19 January 2026

Use of KBI Flexi™-Pave on Trans Pennine Trail

The Folly Lane stretch of the Trans Pennine Trail was an unused bridleway that...

Last Updated: 11 October 2025

Auchterarder Shared Use Path, Phase 2

Auchterarder – Phase 2’ is a 1.5km shared-use active-travel path providing an ‘all-abilities’ compliant...

Last Updated: 11 October 2025

Loch Earn Railway Path

‘Loch Earn Railway Path (LERP) – is a multi-year, multi-phase project which aims to...

Last Updated: 11 October 2025

John Muir Way (Blackness to Bo’ness Section)

This projects delivery has substantially improved a section of the John Muir Way Coast...

Last Updated: 19 January 2026

Bridgeness Biodoversity Project

Bridgeness Biodiversity is a partnership project, located in the busy town of Bo’ness, between...

Last Updated: 10 October 2025

Clyde Walkway – Use of Smart Surface® Soil Stabilisation Technique

The Clyde Walkway is a 65km/40mile route from Glasgow City Centre to the World...

Last Updated: 10 October 2025

Bowline Project at Bowling Harbour, Glasgow

The Bowling Harbour project is another step towards transforming the National Cycle Network into...

Last Updated: 10 October 2025

Welcome to the SATIN Case Studies

Encouraging good practice is often best illustrated through the showcasing of successful solutions. The...

Last Updated: 10 October 2025

‘Mires Path’ Boardwalk Replacement

This case study is about the replacement of a stepped and narrow ‘sleeper’ boardwalk...

Last Updated: 10 October 2025

Battleby House to Redgorton Active Travel Path

This project looks at the creation of a 509m long, shared-use path providing a...

Last Updated: 10 October 2025

Stockingfield Junction Footbridge, Glasgow

The Stockingfield project is first Scottish Canal’s site to use MacRebur products on the...