---
title: Bracklinn Bespoke Steel Timber Bridge
description: "The previous bridge over Bracklinn Falls was washed out in floods in 2004 and gorge was completely re-landscaped. The need for a new bridge as both a path link and a viewing platform in its own right came out as…"
url: "https://soan.org.uk/ask/casestudies/bracklinn-bespoke-steel-timber-bridge/"
updated: "2025-10-12"
category: Case Studies
tags:
  - Bridge
  - construction
  - National park authority
---

# Bracklinn Bespoke Steel Timber Bridge

The previous bridge over Bracklinn Falls was washed out in floods in 2004 and gorge was completely re-landscaped. The need for a new bridge as both a path link and a viewing platform in its own right came out as a clear priority during core paths community consultations. Access restrictions to site necessitated an innovative approach and partners decided that an unusual design would bring more visitors to the site.

[Download case study](/wp-content/uploads/2025/10/67-Bracklinn-Bespoke-Steel-Timber-Bridge.pdf).

![](https://soan.org.uk/wp-content/uploads/2025/10/68-bracklinn_falls_bridge.jpg)
